About us

The Flowtex HDD team brings nearly 30 years of expertise in Horizontal Directional Drilling. Our local specialists possess comprehensive knowledge of the technique, equipment, machinery, and the unique geography and terrain of our operating areas.

Safety is the foundation of everything we do, driven by a shared commitment, meticulous execution, and a dedication to ethical and efficient practices.

Our history

1999

FLOWTEX Servicios Urbanos S.A. is established, becoming a pioneer in the application of Horizontal Directional Drilling (HDD) to the installation of urban service networks.

2000

The company solidifies its presence in Mercosur by introducing advanced equipment, enabling the launch of its Large Crossings Division. These technological innovations position FLOWTEX HDD as a leader in the industry.

2002

FLOWTEX HDD expands its operations, completing significant projects in Peru, Uruguay, Venezuela, and Colombia. The company sets a milestone with its longest project: a 1,600-meter tunnel under the Uruguay River.

2005

Responding to growing demand from the energy sector, the company shifts its focus to large-scale crossings using HDD technology whilst integrating the first compact HDD rig into its operations.

2006

Flowtex HDD begins using next-generation River Crossing facilities, successfully managing and executing large-scale projects.

2008

The company pioneers fluid heating systems during crossings of the Santa Cruz and Grande Rivers in Tierra del Fuego.

2009-2014

Flowtex installs over 15,000 meters of 30" pipelines for various gas pipeline projects. Notable achievements include deep rock crossings under the Neuquén River from the El Mangrullo field for Petrobras and YPF.

2017-2018

The company completes landmark projects, including 4,000-meters of watercourse crossing in the Jaaukanigás wetland in Santa Fe and the reinstallation of the Metrogas 24" pipeline under Av. Madero in Buenos Aires, overcoming complex interferences with bidirectional steering.

2019

Flowtex introduces a new compact, high-productivity drilling rig equipped with an integrated fluid management system.

2020-2021

Despite the challenges of the COVID-19 pandemic, the company successfully completes critical projects while adhering to stringent prevention protocols, maintaining a record of zero contagions.

2022-2024

Flowtex focuses on expanding hydrocarbon transportation and distribution networks from the Vaca Muerta fields, reinforcing its role in the sector's growth.