Av. Córdoba 1856, Piso 7 (C1120AAN)Buenos Aires Argentina
To be a pioneering organization in the development and application of methods of underground tunnel construction for the crossing of interferences or installation of urban and suburban networks, by the method of directional horizontal drilling and intelligent tunneling.
To value our human assets in order to provide a level of service focused on satisfying the broadest technical and economic expectations of our clients and optimize the construction engineering of the method, incorporating new procedures and applications.
We are committed to the professional and creative provision of our services, within a strict code of ethics and compliance with established rules.
1996
1999 /
2000
The company strengthens its position within the Mercosur by introducing a 280 ton rig, allowing for the creation of the Large Crossings Division. Innovations in technology are added such as gyrocompass and electromagnetic steering systems with goniometric fields. The use of downhole mud motors, bits, and reaming systems incorporating rotating cones and tungsten carbide inserts was applied. Multi duct packages are installed in tunnels drilled under more than 500 blocks in the micro and macrocenter of Buenos Aires.
2001 /
2002
During the meltdown crisis in Argentina, an expansion strategy opening up working opportunities in Mercosur and other South American countries was initiated. This resulted in important contracts in Peru, Uruguay, Venezuela and Colombia.
2004 /
2005
Encouraged by the growing demand of the energy sector for the installation of major pipelines, the company focuses its activity on the application of Directional Drilling technology in large crossings, becoming identified as Flowtex HDD S.A.
2006
FLOWTEX HDD S.A. becomes part of the Corplex group, adding to its inventory equipment from Enertex S.A., a sister company of the same group. It operates state-of-the-art River Crossing plants, managing and executing the installation of drilling jobs of up to 42” in diameter and 1600 meters in length.
2008
2009 /
2014
2016 /
2017
2018
2018 /
2019
Seek our Advice Today
They are our best security and principal guarantee. We thank them for the trust they have given us which has allowed us to be a company which can claim a leading position in the execution of HDD technology.